GeoXpr ENVIRONMENTAL SPATIAL INTELLIGENCE
GEOXPR / ENVIRONMENTAL SPATIAL INTELLIGENCE SITE / CORRIDOR / TERRITORY OBSERVATION + MODELING + EXPERTISE

See environmental risk before it becomes a project constraint.

GeoXpr turns a project footprint, corridor or territory into decision-grade environmental intelligence. We combine Earth observation, mass species modeling and senior ecological expertise to map habitats, locate sensitivity, weigh carbon, water and soils, compare alternatives and build a traceable evidence base for assessment and lender review.

Start with what you have: KML, GeoJSON, SHP, coordinates, a route, a concession boundary or a map.
Scale

Project to national scale. One logic, from micro-siting to territorial intelligence.

Evidence

Signal, models and expert ecology. Not generic overlays, and not a black box.

Delivery

Maps, GIS, methods and uncertainty. Built to be reviewed, challenged and reused.

Designed for workstreams under
IFC PS6 / GN6EBRD PR6Equator PrinciplesESRS E4
Exhibit AFrom weak spatial logic to decision-grade evidence
GeoXpr ecoMap: multi-class ecological habitat classification Generic land-cover classification, four classes Land-cover signal ecoMap™ Drag to compare

Land cover is a starting signal, not an ecological baseline.

Spectral classes on their own do not resolve habitat typology, ecological meaning, Natural or Modified logic, or where uncertainty needs field verification.

GeoXpr converts signal into ecological units.

Remote sensing is read through habitat logic, species evidence and expert review, so the map supports survey design, alternatives, impact assessment and mitigation.

PlatformFour decision layers

Not another environmental database. A system for resolving decisions.

GeoXpr turns heterogeneous ecological evidence into four interoperable spatial products. Each answers a different decision question, and all keep their data, method and confidence trail.

01
P-01 / ecoMap™

Habitat intelligence ecosystems

What is there, where, and with what confidence?

Field-grounded ecosystem and habitat classification from remote sensing, reference data and ecological interpretation, from footprints to territories.

OUTPUTS · habitat polygons · typology · condition · confidence · change layers · GIS files
02
P-02 / divMap™

Species intelligence biodiversity

Where is biodiversity likely to concentrate?

Mass species distribution modeling across hundreds to thousands of taxa, combining occurrence data, environmental signal and conservation relevance.

OUTPUTS · SDMs · richness and rarity · priority taxa · uncertainty · survey-targeting layers
03
P-03 / threatMap™

Risk prioritisation exposure

Where do sensitivity and project pressure compound?

A ranked spatial view of ecological sensitivity, threats, fragmentation and project exposure, built to reveal the sectors that deserve attention first.

OUTPUTS · ranked risk surfaces · hotspots · pressure layers · alternatives screening · monitoring priorities
04
P-04 / offsetMap™

Mitigation intelligence action

What to avoid, restore, monitor or compensate?

Spatial decision support for the mitigation hierarchy: compare alternatives, quantify residual impact and screen restoration or compensation opportunities.

OUTPUTS · avoidance scenarios · residual-impact logic · restoration and offset candidates · accounting-ready evidence
Operating rangeOne method, multiple scales

From one route alignment to an entire country.

The same evidence architecture supports a single asset, an infrastructure corridor, a portfolio or a territorial programme.

Site
Early screening and micro-siting. Locate sensitive habitats, species signals and avoidable constraints before design freeze.
Corridor
Routes and linear infrastructure. Compare alignments, target field effort and expose cumulative risk.
Portfolio
Comparable intelligence across assets. Prioritise due diligence, capex attention and monitoring on one spatial standard.
Territory
Reusable environmental infrastructure. National or regional habitat systems, species models and mitigation opportunity layers.
WorkflowOne evidence chain, five spatial layers

The value appears when the layers work together.

From a generic land-cover signal to habitat interpretation, biodiversity concentration, threat-weighted concern, Critical Habitat triggers and mitigation opportunity. Fieldwork tests the uncertainties that matter, not weak spatial logic.

ecoMap ecosystem and habitat classification divMap biodiversity concentration surface threatMap threat-weighted concern Critical Habitat trigger support map offsetMap mitigation and offset opportunity zones
GEOXPR / LAYER STACKS1 / S2 · v3.2
01 / ecoMap™

Resolve ecosystems and habitat logic.

Replace generic land-cover with project-scale ecological units, habitat typology and confidence that can be tested in the field.

LAYER 01 / 05
Reproducibility is part of the deliverable. Versioned inputs, scripts, parameters, validation, sensitivity checks and explicit limitations stay attached to the output, so the evidence can be reviewed, repeated and updated.
MethodEvidence chain, no black box

From signal to decision, on the record.

Uncertainty is solved by making it spatial, hierarchical and measurable from day one. Every link is preserved, referenced and open to review by your experts and your lenders.

Open method

Parameters stated, not hidden behind a model.

Reproducible

Every result traces to its inputs and version.

Attributed

Expert judgment qualified and signed.

Admissible

Built to survive PS6-grade scrutiny.

ReturnThe economics of getting it right early

An early file protects up to 25x its cost.

The cheapest point to move a route is on a screen, not in the field. Priced to the exposure it retires, an early file is the highest-leverage line in an environmental budget.

Leverage · IFC PS6 case
0x
A EUR 80 to 120k file, deployed before design freeze, has protected EUR 0.8 to 2.0m of avoidable exposure.
You invest
You protect
You invest
EUR 80-120k
Early intelligence file, before design freeze.
You protect
EUR 0.8-2.0m
Avoidable exposure retired: ESIA / CHA / BAP revision, expert review, redesign, delay.
Also on record
US$50-100k → US$0.25-0.65m
A defensible route to IFC PS6, secured early.

Saving = verified avoided delay + verified avoided survey, redesign and offset rework, less the GeoXpr fee. No avoidance, no saving.

Illustrative project values, not a guarantee. BPL railway: 8% worksite-footprint reduction from early mitigation. Julien et al. 2021: median mitigation-hierarchy cost EUR 399,595.

AssessmentAgainst the alternatives

A category of one.

Generic overlays are thin. Field-only surveys arrive late. Black-box models cannot be defended. One approach is spatial from day one, proprietary and expert-anchored, and admissible.

Generic GIS overlaysField-only surveysBlack-box modelsGeoXpr
When it actsLate, at reviewAfter budgets lockLate and staticFrom day one
DefensibilityThin, genericStrong but narrowNot attributableExpert-anchored
AuditabilityPartialManualOpaqueVersioned, link by link
Lender-readinessWeakCase by caseRejected under PS6PS6-grade by design
BreadthSingle layerSpecies-focusedNarrow targetWhole environmental surface

Proprietary methodology and data. Attributed expertise. Day-one spatial. Admissible. Difficult to replicate, by design.

Selected workAnonymized

Tested where decisions were expensive.

A sample of engagements across sectors and scales. Client and location details withheld under confidentiality.

Transmission corridor · East Africa

Alignment resolved before survey.

Alternatives screened on ranked sensitivity, field effort focused on the sectors that mattered, and a Critical Habitat question answered before alignment freeze.

OUTCOME · route re-optimised pre-design
Wind portfolio · Iberia

One standard across the portfolio.

Comparable habitat and sensitivity intelligence across sites, so due diligence, capex attention and monitoring went where exposure was highest.

OUTCOME · portfolio-wide comparability
Mining concession · West Africa

A lender-ready baseline.

Habitat baseline and mass species modeling to a lender standard, with an auditable evidence trail built for IFC PS6 review from day one.

OUTCOME · PS6-grade evidence trail
Trusted by
Selected clients & collaborators

Bring your hardest project.

Send a footprint, a route or a boundary. We will build the evidence chain against it, and show you what a defensible baseline looks like.

KMLGeoJSONSHPCoordinatesRouteConcession boundary
GeoXpr SAS · environmental spatial intelligence · confidential